News
An estimate from a 2011 feasibility study proposed dredging about 50,000 cubic yards from the Narrow River to fill up just Narragansett Town Beach, which put the price tag at around $2 million.
N ARRAGANSETT – Dredging the Narrow River to unclog the river’s mouth and replenish Narragansett Town Beach with sand could ...
The Delaware Department of Natural Resources and Environmental Control has made significant progress in its emergency dredging and beach nourishment project at the north side of Indian River Inlet — a ...
The dredging project was created to support more than 100 farmers whose land floods each year due to river backup, wrote State Rep. Ron Tusler, a Republican from Harrison, Wisconsin.
The dredging will be done in a 1.5-mile stretch of the river south of the Route 197 bridge that connects Saratoga and Washington counties in what is called the Thompson Island pool.
NARRAGANSETT — Dredging the Narrow River to unclog the river’s mouth and replenish Narragansett Town Beach with sand could cost between $2.6 million and $7.2 million, according to an ...
Dredging needs to happen on the St. Joseph River leading into the lake. Dredging cannot occur in the St. Joseph River in May and June, because that’s spawning season for some varieties of fish ...
At Hanford Reach, the Steele family has bridged partisan divides for decades to ensure that this free-flowing stretch of the ...
On March 2, 2011, the then HC bench comprising Justice Md Mumtaz Uddin Ahmed and Justice Gobinda Chandra Tagore issued a rule ...
16d
Korea JoongAng Daily on MSNDredging up flood prevention: Daejeon project credited with lack of monsoon damageAs rivers burst their banks and flood alerts rang out across Korea this week, Daejeon remained eerily dry — and it may have city hall’s excavators to thank.
Results that may be inaccessible to you are currently showing.
Hide inaccessible results