News

With plans calling to expand the warehouse to 378,930 square feet, increase the interior height of the building as well as increase the number of loading docks to 23, when 10 currently exist, as ...
Morris Companies is looking to build a new 200,000-square-foot warehouse and office space at 79 Austin Ave. It would also have 272 parking spaces, 21 loading docks and 41 trailer parking spaces.
The plan, offered for 1001 Glenlivet Drive, involves a 39,870-square-foot warehouse featuring five loading docks, three loading spaces and 25 parking spaces. The parcel rests in the Light ...
"We just don't believe that a 1.2 million-square-foot warehouse, with hundreds of loading docks is an appropriate thing to plunk down between two over-55 communities, a day care center, and two ...
The company said it would create 100 trailer loading docks for the larger building, and 16 for the smaller one. It proposed about 670 employee parking spaces that would serve both warehouses.
The first would be 318,190 square feet, have 313 parking spaces, 87 loading docks and 11 trailer stalls. The second would be 505,440 square feet with 503 parking spaces, 100 loading docks and 98 ...
The building has 20-foot ceilings, six loading docks and two, 14-foot-tall grade-level doors. Built originally for a manufacturer of jet engines, the building’s wiring can handle heavy power ...
A rendering shows the plan for a 170,000-square-foot warehouse along Day Hill Road in Windsor. “The special use (permit) will permit the construction of an industrial building to replace the ...
Brooklyn-based developer 41 Glendale LLC was scheduled to continue the hearing on its application to build a 161,580-square-foot warehouse off Silver Lake and Glendale avenues at Dec. 7’s ...
The 90,936-square foot distribution warehouse, which would have 14 loading docks for trucks, would be built on vacant property at the location, officials said.
Some Montgomery residents are concerned a development featuring a warehouse and truck storage area proposed for the northeastern part of the village will make flooding problems worse in that ...