News

Tungabhadra Dam Gate Broken in August 2024 remains unrestored. Temporary log gate now leaking; full installation of new gate ...
The installation of a permanent crest gate for the 19th spillway of the Tungabhadra dam, which was washed away on Aug 10 last ...
Meanwhile, there was heavy inflow due sudden rains in the Krishna riverbed. The Tungabhadra dam recorded 17.17tmc-ft of water on Sunday as against only 3.34tmc-ft last year.
Hyderabad: The Krishna river basin kicked off the 2025-2026 water year on a high note, with the Srisailam dam, a joint project of Telangana and Andhra Pradesh, receiving an impressive inflow of over ...
The Krishna River, along with its tributary, the Tungabhadra River, is experiencing significant flooding for the first time this season. The floodwater released from Jurala is now heading toward the ...
According to Tungabhadra Dam official Narayana Naik, Hardware Tools and Machinery Project Company is scheduled to replace all the 32 crest gates by the end of June 2026.
Munirabad (Koppal): Of the four companies that vied for the tender to replace all 33 crest gates of the Tungabhadra reservoir, the Gujarat-based Hardw.
We are expecting that the new crest gate will be installed to replace the damaged one at gate no. 19 in Tungabhadra Dam by July end,” Mr. Hitnal said.
TB dam’s 19th gate replacement postponed to November due to high water levels; Ahmedabad firm to supply all 33 new gates.
The dam contents are according to the latest dam basin surveys. The inflow that is reflected in the bulletin does not take into account evaporation and abstraction of water.