News
The contractors involved in the construction of the Narrow Water Bridge have confirmed that the project is on course to be ...
President Bola Tinubu will today commission the completed part of Phase I, Section I (30 km of 750 km) Lagos-Calabar Coastal Highway.
President Bola Tinubu has reaffirmed the federal government's commitment to local content, technology transfer, and the ...
President Bola Tinubu has officially commissioned the completed 30-kilometre portion of the Lagos-Calabar Coastal Highway, ...
David Umahi, on Friday described the Lagos-Calabar Coastal Highway as a Renewed Hope signature project and a signpost of holistic ...
In a dramatic posturing, the Minister of Works, Dr. David Umahi, has dismissed the insinuation by the apex association of the ...
The Minister of Works, Engr. Dave Umahi has disclosed that the completed part of Phase I, Section I (30 km of 750 km) of the ...
Nakuru — Construction of the multi-billion shilling Rironi-Mau Summit dual carriageway will commence ... last more than 14 hours, the busy section of the road has numerous black spots due ...
President Bola Ahmed Tinubu has approved the commissioning of the completed section of Phase I, Section I (30km) of the Lagos-Calabar Coastal Highway, scheduled to hold on Saturday, May 31, 2025, at ...
Tinubu, at the commissioning of the Lagos-Calabar coastal highway, said public infrastructure must be protected and maintained collectively by citizens.
The section will ... of a 10-mile (16km) dual carriageway being built between the Black Cat roundabout and the Caxton Gibbet roundabout near Cambourne. The new Roxton bridge has been created ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results