News
Tungabhadra Dam Gate Broken in August 2024 remains unrestored. Temporary log gate now leaking; full installation of new gate ...
The installation of a permanent crest gate for the 19th spillway of the Tungabhadra dam, which was washed away on Aug 10 last ...
TB dam’s 19th gate replacement postponed to November due to high water levels; Ahmedabad firm to supply all 33 new gates.
The dam authorities issued an alert in the morning saying that they will increase water release into the river course to 1,20,000 cusecs from 90,000 cusecs depending upon the inflow into the dam.
Hosted on MSN10mon
Tungabhadra Dam in Distress: Officials Say 'Nothing Alarming' As Political Slugfest Takes Centre Stage - MSNThe 71-year-old Tungabhadra Dam in Hospet, Karnataka, is a dam in distress. Less than 24 hours after the BJP-JDS ‘padayatra’ demanding the resignation of Chief Minister Siddaramaiah ended, the ...
The current water inflow is over 85,000 cusecs, and within three days the dam storage will again increase to over 20 TMC. The crest gate gave way because the chain link was more than 50 years old.
The massive inflow of water into the Krishna river due to the washing away of one of the crest gates of Tungabhadra dam has forced the Andhra Pradesh government to keep open the gates of its two ...
The engineer said despite the forced release of water from the Tungabhadra dam, the inflow to Srisailam would be much lesser than the peak flood. June 13, 2025 e-Paper. LOGIN Account.
The Tungabhadra dam authorities issued a high alert for low lying areas following heavy floods from upstream Western Ghats on Sunday. ... The inflow was just 13,340 cusecs on the same day last year.
Anantapur: After fixing the Stop Log gates at the 19th gate, the Tungabhadra dam has been improving its storage capacity. It recorded 75.13tmc-ft at 1624.58-ft water level, as against the maximum ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results