News

From there it was transported outside the pit to the concentrator by conveyor belt. The mine included 19 conveyor belts (totaling 37,333 feet) to move ore and waste rock from the pit.
The repair was a delicate procedure in which they had to collect broken parts from along the length of a conveyor belt which carries bread trays slowly through the 75ft-long oven.