News

From the top center of the deck, use a pencil and tape measure to mark the layout of the first sleeper on the concrete. Start a 1/2 inch from the house’s foundation or concrete edge.
Finally, the bond between high-performance concrete and profiled steel decking has been investigated to improve the overall performance of composite slabs.
Do you want a slab of concrete floating 18" above grade, or a 120 cu. ft. concrete fill? Either way that sounds like a hassle. I don't see why there would be an advantage in using concrete.
In a composite metal deck system, a 3-inch-deep metal deck acts as a permanent form to receive a composite concrete slab.
The FORTA-FERRO macro-synthetic fiber was used in a very large slab on metal deck project in Middleton, Del., that provided a working surface for the 2nd-level order fulfillment operations for the ...
Composite steel‐concrete slabs represent a successful integration of two distinct materials, combining the tensile strength and ductility of steel with the compressive capacity and durability of ...