News
Rendering Courtesy of Stantec, Painting: Jara Henry Valenta, East River, 1934, oil on canvas, 23 x 32 in. (58.4 x 81.2 cm.), ...
East River Greenway inches forward with $100M cash infusion The long-dormant waterfront project is finally getting a boost By Amy Plitt @plitter Apr 25, 2017, 1:19pm EDT ...
MANHATTAN, N.Y. (PIX11) — A popular New York City parkland is falling to pieces and improvements are on the way. The East River Greenway Esplanade stretches from the east side to connect with ...
Waterfront access currently ends at East 63rd Street. There, the Greenway takes a pedestrian bridge over the FDR Drive. The path then follows Sutton Place under the Queensboro Bridge (Ed Koch Bridge).
The new East Midtown Greenway and renovated Andrew Haswell Green Park. The greenway, newly constructed over the East River, broke ground in 2019, but the pandemic pushed back the opening.
The East River Greenway—a planned waterfront esplanade between East 38th Street and East 61st Street—is moving forward. The formal design process for the stretch of the Greenway between East ...
However, a significant 12-block gap along the East River has marred this vision. The gap that was supposed to be closed with the help of the United Nations.
The East Midtown Greenway is a stretch that begins around 53rd Street and connects to the northern pathway along the river. A pedestrian path and bike path run parallel.
Prior to the East Midtown Greenway project, the last significant gap that the city closed along the Manhattan Greenway was between 91st and 81st Streets along the Hudson River.
Results that may be inaccessible to you are currently showing.
Hide inaccessible results